For a beautiful garden
Fibreglass Pool Resurfacing in Perth
Can I Help
Fill in the form below and i will contact you within 24 hours, looking forward to being of help
OUR BEST SERVICES
Fibreglass Pool Resurfacing Specialists
What is the Process.?
We use the international standard for a Fibreglass Pool Restoration, commonly referred to as the 5 stage process. After the Pool has been drained and braced (preventing the potential collapsing of the pool) the surface is prepared, with all blackspot and blistering being removed. Any repairs that are required are now undertaken prior to commencement of the Pool Restoration process such as patching particularly damaged areas on the pool shell. Only once these critical repairs are completed will we start the pool resurfacing process.
- Apply the first coat of the Vinyl Ester resin to the pool shell.
- The Fibreglass is now applied to the surface
- A bulk layer of Vinyl ester resin is applied over the fibreglass layer.
- After these three layers are allowed to dry the fourth coat (fill coat) is applied. This coat thickens and fills the first three coats and adds increased thickness to the layers which is ultimately what will be the new protective barrier against future blackspot and Blistering
- Only when the the first four layers have cured will the final step be undertaken. The surface is buff sanded smooth in preparation for the Topcoat, for which there are a number of colour options.
BEST MISSION
Over 15 Years Experience
Innovation Pool Resurfacing, a family business, was established in 2005, specialising in the restoration of Fibreglass Pools. With advancements in Resin technology, Pool Resurfacing in Perth has evolved to a higher quality of finish and a better, longer lasting product. After 15 years in the industry we feel as though we have a solid understanding of all the components that go into producing a fantastic looking Pool that you can be proud of and thats going to stand the test of time in Perths harsh environment.
FAQ
The cost of Resurfacing is dependant on a number of items.
1. The size of the Pool and the complexity of the restoration such as additional stepps, handrails.
2.The present condition of the pool, how much blistering and blackspot is present in the pool and has the pool structural issues
An average size fibreglass pool of 8 metres by 4 metres would cost approximately $7000 to $11,000 tax inclusive
A standard Fibreglass pool will take 7-10 days to complete, weather permitting. It is vital that the pool be given time for the final coat to cure as this will dramatically increase the lifespan of the pool.
The total budget for the pool restoration will be dependant on if any optional extras are added to the project such as a new pool light,chemical balancing, or replacement of old fittings
We only ask for a small deposit to initiate the process, which then serves as confirmation of your order so that a timeline can be created for your project
FIBREGLASS POOL COLOUR OPTIONS
TAKE A LOOK AT ALL OF OUR FIBREGLASS POOL COLOUR OPTIONS. IF YOUR NOT SURE WHICH COLOUR IS BEST SUITED TO YOUR POOL WE ARE MORE THAN HAPPY TO GUIDE YOU AND SUGGEST THE BEST OPTIONS FOR YOUR POOL AND SURROUNDINGS. WE WILL RUN THROUGH ALL THE OPTIONS WITH YOU AND SHOW YOU IMAGES TO HELP YOU VISUALISE THE END RESULT.
OUR SERVICES
Fibeglass pools
Find out More
Pool Repairs
Find out More
Concrete Pools
Find out More
Gallery
Find out More
Landscaping
Find out More
Blog
Find out More
Our Suppliers





